Kennedy Center Theater Lab
In 1987, the comedy Shear Madness was brought in for a short run in the Kennedy Center’s Theater Lab. 20+ years later, it was still running. Theatre Projects worked closely with the Kennedy Center and the producers of Shear Madness to completely update the theatre from a “temporary” fit-out, while managing to keep the same intimacy and flexibility in the 400-seat theatre that has won over audiences and brought the show numerous awards. The renovation included a complete seating and equipment overhaul, plus upgrades to backstage areas, support space, and stage access for performers. All the performance lighting in the Theater Lab was converted to low-energy consuming LED lighting. Our work also included the architectural lighting for the Theater Lab and adjacent areas.
Chapman University, Marybelle and Sebastian P. Musco Center for the Arts
2016
North America
Theatre Projects and the design team collaborated to build incredible versatility into the 88,000 square foot center’s theatre. To accommodate…
Seabury Hall, `A`ali`ikuhonua Creative Arts Center
2012
North America
This 10,000 square foot facility is made largely of pre-engineered materials, but maintains a pronounced warmth and flexibility. The arts…
Cobb Energy Performing Arts Centre
2007
North America
Since its opening, this 181,000 square foot center has quickly become one of the South’s major touring venues, hosting rock,…
