Kennedy Center Theater Lab
In 1987, the comedy Shear Madness was brought in for a short run in the Kennedy Center’s Theater Lab. 20+ years later, it was still running. Theatre Projects worked closely with the Kennedy Center and the producers of Shear Madness to completely update the theatre from a “temporary” fit-out, while managing to keep the same intimacy and flexibility in the 400-seat theatre that has won over audiences and brought the show numerous awards. The renovation included a complete seating and equipment overhaul, plus upgrades to backstage areas, support space, and stage access for performers. All the performance lighting in the Theater Lab was converted to low-energy consuming LED lighting. Our work also included the architectural lighting for the Theater Lab and adjacent areas.
Siemens Healthineers, Corporate Auditorium
2018
North America
As part of Siemens’ US expansion, the medical technology company commissioned a multipurpose auditorium within their new manufacturing and R&D…
El Museo del Barrio, El Teatro
2019
North America
This unique multipurpose theatre was originally designed to be a children’s theatre. That legacy can still be seen today through…
Chicago Shakespeare Theater, Navy Pier
1999
North America
To strengthen the connection between actor and audience in Chicago Shakespeare Theater’s new seven-story home, we designed a thrust theatre…
