Marcus Garvey Park, Richard Rodgers Amphitheater
The park’s amphitheatre had been a popular destination for almost 40 years, but was in need of a renovation to improve its limited performance capabilities, seating, and sightlines. The new design brings the audience closer to the performers and improves the visibility of the action on stage. Other improvements include a roof canopy which provides shade to park-goers, improved seating, and performer support spaces.
The park’s amphitheatre had been a popular destination for almost 40 years, but was in need of a renovation to improve its limited performance capabilities, seating, and sightlines. The new design brings the audience closer to the performers and improves the visibility of the action on stage. Other improvements include a roof canopy which provides shade to park-goers, improved seating, and performer support spaces.
Benaroya Hall
1998
North America
This 187,000 square foot facility features two performance halls and occupies an entire city block in downtown Seattle. The 2,500-seat…
Alabama School of Fine Arts, Dorothy Jemison Day Theater
2012
North America
This new facility was built for both school and community use and features a 500-seat multipurpose theatre with sprung floor,…
Chicago Shakespeare Theater, Navy Pier
1999
North America
To strengthen the connection between actor and audience in Chicago Shakespeare Theater’s new seven-story home, we designed a thrust theatre…
