Fuller Middle School, Chris Walsh Performing Arts Center
Framingham, Massachusetts, USA
Theatre Projects
The facility includes a 420-seat auditorium, perfect for hosting concerts, musicals, and other student presentations. The side seating and stage level in the hall are both at lobby level, making the room accessible to people with mobility issues, and we designed the auditorium to have seven motor-assist linesets to fly lights safely in an educational setting.
Theatre Projects
owner:
Fuller Middle School
architect:
Jonathan Levi Architects
acoustician:
Acentech
users:
Fuller Middle School
spaces:
- 420-seat multipurpose theatre
construction type:
New construction
theatre type:
Arts & cultural centers, Multipurpose theatres, School & academy
services:
Theatre equipment design and specification
completion:
2021
Theatre Projects